Steps and a disabled ramp were added to the design as the project developed. TW Timberwork were able to design and make both, ensuring minimal intrusion to the overall affect. The drop from the stage to the ground was measured and then evenly divided by the number of steps required, which was two. The drop measurement was then calculated to ensure the ramp gradient was within safety regulations.
The team at TW timberwork enjoyed working alongside the Nike instillation teams and were pleased with the overall finish and outcome.
TW Timberwork were contracted to build possibly the largest deck to date at 24m X 16m.

Rob and his team were super efficient and did an amazing job through some of the worst British weather on records.
Every member of Rob and his team turned up every day, always the first to arrive and last to leave.
Their attention to detail was perfect following a complex pattern and cutting shapes into the timber deck which was done to maximum precision.
I would have no hesitation in recommending Rob and his team for any decking requirements private or commercial.
Great job lads thanks
Sarah Playground Creative- Experiential agency